The Ministry of Education and several contractors today inked agreements to construct the Hosororo Secondary School in Region One along with a secondary school that will be built in Tuschen, Region Three.

The two schools will be built at $2.619B and $864.705M respectively. Both projects were divided into various lots to allow for an earlier completion date. The schools are expected to be completed within seven to eight months from today.

Minister of Education, Priya Manickchand said her agency is on a massive drive with secondary education. She said these projects are important to the ministry because, with more students in the system, space becomes an issue thereby necessitating the construction of more schools so that students and teachers can learn and teach in a comfortable environment.

A 3d rendering of what the new school at Tuschen should look like upon completion

Minister Manickchand said the Government of Guyana wants to ensure that children can be given the opportunity to have a sound secondary education across the country.

The education minister also warned the contractors present to avoid delays as students are expected to enroll by September 2024.

Also present at today’s signing ceremony were Permanent Secretary, Alfred King, Chief Education Officer, Saddam Hussain and Special Projects Officer, Ron Eastman.

3D rendering of what the Tuschen Secondary School should look like upon completion

The secondary school at Tuschen will be a fully reinforced concrete structure combined with a circular and cylindrical building outline that is covered in a dome roof. The building will also be branched with several scientific and research centres, a multi-purpose and cafeteria hall, a storage and changing area and a library and document centre. The school will have 24 classrooms to accommodate over 800 students. The science centre will be equipped with a physics, chemistry and biology lab while the TVET Centre will have industrial and home economics laboratories.

The school will also have sanitary blocks for the student and teacher population. The fire prevention features include fire escape exits, escape doors, fire alarms, extinguishers, limited timber usage, metal ceilings and fire-retardant panels. The outdoor space will include a recreational facility for basketball, cricket and other sports.

The contracts awarded for the construction of the secondary school at Tuschen are as follows:

Lot -1 Sub-Structure Works – S&K Construction for$285,101,936

Lot -2 Super-Structure Works- AS Construction for $179,100,000

Lot -3 Plumbing Works – VG Group Guyana Inc. for $29,212,549

Lot -4 Electrical Works – N Balgobin & Sons $72,467,910

Lot -5 Finishing Works – K&S General Construction for $137,833,000

Lot -6 External Works – AS Construction for $160,990,000

As for the Hosororo Secondary School, it will have 29 classrooms to accommodate over 500 students. Its science centre will also feature physics, chemistry and biology laboratories. The TVET centre will have both industrial and home economics laboratories. A student dormitory and visiting area will also be constructed to accommodate 200 students while the teachers’ duplex living quarters will accommodate 20 teachers.

There will also be sanitary blocks for both students and teachers. The fire prevention features include fire escape exits, escape doors, fire alarms, extinguishers, limited timber usage, metal ceilings and fire-retardant panels. The outdoor space will accommodate several sporting disciplines.

The contracts awarded for the construction of the Hosororo Secondary School are as follows:

Lot -1 Site Development Works – International Imports & Supplies for $280,204,731

Lot -2 Sub-Structure Works – School Building International Imports & Supplies for $303,837,015

Lot -3 Sub-Structure Works, Dormitory – Supreme Contracting & Supplies for $196,319,040

Lot -4 Sub-Structure Works, Teachers Quarters – International Imports & Supplies for $180,402,585

Lot -5 Super-Structure Works & Electrical – VG Group Guyana for $1,411,400,917

Lot -6 Plumbing Works – VG Group Guyana for $247,043,973

The consultant on both projects is GR Engineering.

LEAVE A REPLY

Please enter your comment!
Please enter your name here